technical parameter
Maximum internal diameter of this set of pressurized equipment Φ 186mm can meet the needs of any construction measures; The static sealing pressure of BOP system is 35MPa, and the dynamic sealing pressure is 21MPa; The stroke of lifting cylinder is 3.3m; When the oil pressure is 20MPa, the upper jacking force of the oil cylinder is 60.5t and the lower pressure is 40T
Pipe string plugging specification Φ 60mm Φ 52mm Φ 40mm
Suitable for oil pipe 3 "1/2 2" 7/8 2 "7/8
Sealing capacity 35MPa 35MPa 30MPa
The technology under pressure not only has good applicability for the operation under pressure in water wells, but also can be applied to the construction of oil and gas wells, so it effectively solves the problems in the operation under pressure at present.
At present, our company has carried out the construction of gas well under pressure in Sinopec North China Petroleum Bureau.
Eight innovation patents
Four technological advantages
Fast speed and low energy consumption: seven gears are combined with the area difference of each oil chamber to maximize speed and minimize energy consumption under various loads. Large lifting and pressurization stroke: the lifting stroke reaches 16.8m, and the pressurization stroke reaches 12.8m. One oil pipe can be raised at one time.
Synchronous lifting and lowering: the six chamber combined oil cylinder is equipped with a pulley system to synchronously realize the functions of pipe string lifting and lowering.
Cylinder combination eliminates cylinder holding: the six chamber combined cylinder will not produce cylinder holding.
Solve seven technical problems
Ø no blowout, no well killing, green and environmental protection, realizing the real oil and gas reservoir protection. Ø no carbon emission, no dust, low noise, realizing ecological operation.
Ø the water well does not need to stop injection and pressure relief, so as to maintain the balance of formation pressure field and protect formation pressure.
Ø kill fluid and surface equipment are not required to reduce production costs.
Ø hydraulic pulley mechanism, no crown block,
Ø store the energy released during the down stroke and use it when necessary to reduce energy consumption.
Ø single cylinder with six chambers, no cylinder hold, no tilt.