On September 2, The company's main leaders Ma Houquan, Wang Hongliang, technical expert Ma Jian were invited to Sinopec headquarters to have a special exchange meeting with the leaders and experts of Sinopec Oilfield Service Corporation. Sinopec Oilfield Service Corporation vice general manager Zhang Jinhong, Sun Bingxiang attended the meeting, the relevant chief experts and relevant department personnel, attended the meeting.

At the meeting, the company reported the situation of the equipment and technical services for the non plugging pressure operation, and discussed the operating principle, operation steps, operation technology and safety performance of the pressure-packed equipment. The two sides had a preliminary discussion on the next step of cooperation and formed a number of consensus.

The meeting held that the company made bold innovations in design, research and development, equipment matching, operation steps and other aspects of non plugging pressure equipment, which effectively avoided the risk of "flying pipe" in the process of tubing lifting with pressure, and ensured the construction safety of tubing lifting with pressure in low pressure oil and gas Wells. On the basis of the current industrial application, it is necessary to strengthen the research on automation and intelligence to further improve the operation efficiency and ensure the "double safety" of equipment essence and field operation.

Company in terms of low pressure oil and gas Wells with pressure operation, formed the equipment research and development ability and industrial application, Sinopec Oilfield Service Corporation will in the high pressure oil gas well to bring pressure homework as characteristic business development, the two sides in the field has great cooperation with pressure equipment needs and space, it is recommended to take pressure homework equipment research and development, the localization of alternative cooperation, engineering services, etc. On the one hand, it is necessary to strengthen technical exchanges and cooperation in research and development, and jointly promote the improvement of the technical capacity of the new belt drilling machine and the configuration of automated workover equipment. On the other hand, it is necessary to explore the cooperation mode in the development of hard-to-use reserves of old eastern oilfields, the resumption of production after long well shutdown, and the engineering service of natural gas Wells in the Northern Hubei working area, so as to jointly promote the safe and efficient development of oil and gas.
